AFA.2011.0041_Construction of the Node of Connection to IC24 of the New Designated Urban Centralization of "Nova Maia", Including the Acquisition of Necessary Land, in the Parish of Nogueira
Following this study, 2 patrimonial occurrences of an archaeological nature were identified in the area of ​​indirect project allocation.
The following minimization measures were proposed:
Measure of class C Systematic prospecting of areas classified in cartography as having partial or no visibility
Class D Measure Systematic prospecting of the entire patrimonial occurrence area before and after deforestation until the rocky substratum or mineral levels of the soils removed are reached and systematic and integral archaeological follow-up of all the revolving plant Undertaking.
State
Complete
Date
To star in 20/11/2011.
Responsible
Artur Fontinha