AFA.2012.0047_Linha Mourisca - Pereiros, Opening for SPI at 220kV (5km), Agueda
Following this Study, 1 Archaeological Occurrence was identified in the area of ​​indirect project allocation.
Minimization measures of a general nature were proposed:
Class D measurement - Systematic prospecting of areas classified in cartography as having partial or no visibility before and after deforestation until reaching the rocky substrate or mineral levels of the removed soils and systematic and integral archaeological monitoring of all the Land of the undertaking.
State
Complete
Date
To star in 16/06/2012.
Responsible
Artur Fontinha