loading

AFA.2012.0047_Linha Mourisca - Pereiros, Opening for SPI at 220kV (5km), Agueda

Following this Study, 1 Archaeological Occurrence was identified in the area of ​​indirect project allocation. Minimization measures of a general nature were proposed: Class D measurement - Systematic prospecting of areas classified in cartography as having partial or no visibility before and after deforestation until reaching the rocky substrate or mineral levels of the removed soils and systematic and integral archaeological monitoring of all the Land of the undertaking.

serviço 1

State

Complete

serviço 2

Date

To star in 16/06/2012.

serviço 3

Responsible

Artur Fontinha