loading

AFA.2018.0214_Central Solar_FUNDÃO

The Brejo Solar Power Plant Project will be basically formed by solar generators, each integrating an inverter station and a transformation station. The Solar Park will occupy an area of ??approximately 38 hectares, and is currently expected to implement a total power of 23.5 MWp. Associated with the central will be constructed an electric line that guarantees the connection of the Project to the electric network of the Public Service Electric System, starting at the Solar Power Station and at the Iron Substation (REN) or Tortosendo (EDP), yet to be defined.

serviço 1

State

Proceeding

serviço 2

Date

To star in 15/03/2019.

serviço 3

Responsible

Artur Fontinha