loading

AFA.2018.0170_Conversion from 6KV to 30KV in the City of Elvas

The project under analysis concerns the transformation of the medium voltage network that serves the historic center of the city from 6 to 30kV, which implies, in some sections, duly indicated in the documentation and identified in a meeting with Mr. Eng. Armando Pedro of EDP , in the Regional Directorate of Culture of the Alentejo, the opening of ditches for the necessary infrastructures facilities. These ditches, according to the technical drawings with their characteristics, have a depth of 1.20m and a width of 0.60m. All sections mentioned are located in the Calssified area as World Heritage by UNESCO and also by the architectural elements classified as National Monument or in the respective protection zones.

serviço 1

State

Proceeding

serviço 2

Date

To star in 23/08/2018.

serviço 3

Responsible

Margarida Leite