AFA.2016.0093_ER 206 - V.N Famalicão (km 22 + 320) / Intersection with ER 310 (KM 37 + 528) - Rehabilitation
In addition to the bibliographical and documental research already done, systematic fieldwork should be carried out. These works will enable the recognition, description, classification and inventory of data collected during the previous phase, and will allow a better evaluation of the archaeological, historical, ethnographic, natural and patrimonial potential of the study area and its surroundings. The fieldwork consists of a systematic and targeted approach to the terrain of all areas where the project components are installed, wherever the terrain topography permits, centered on the proposed route, supported by cartography in paper format, and georeferencing with GPS . The study area corresponds to a systematic and directed prospecting of the corridor of 400 m in diameter. There will also be a collection of oral information of a specific nature or an indication of the surrounding area.
State
Complete
Date
To star in 06/01/2016.
Responsible
Artur Fontinha