AFA.2010.0018_ER350 - Bridge of Palmeiria to KM 9 + 351 and ER357 - Bridge About Ribeiro Velho to KM 0 + 526 Project of Rehabilitation / Enlargement of Art Works, Leiria
As a result of this Study, no Patrimonial Occurrences of either architectural, archaeological or ethnographic nature were identified in the area of direct and indirect project allocation.
Through archaeological prospecting and documentary surveys, as mentioned above, no structures, habitats or traces were found that could impede the continuation of the project.
It is considered that the project under study does not imply impacts to the heritage, and therefore no minimization measures were proposed.
State
Complete
Date
To star in 14/06/2010.
Responsible
Artur Fontinha