AFA.2010.0026_Filipino Bridge or Old Bridge of Valhelhas Project of Rehabilitation / Replacement of the Artwork
The following minimization measures were proposed:
1 Archaeological drawing on a 1/40 scale of the upstream and upward elevations and the interior of the 4 arches and the Archaeological Monitoring of the dismantling of the rock silts and the following reconstruction of the arch No. 4, in order to ensure that it remains as possible as possible, In the works of "disassembly and reconstruction of arch No. 4, restoring the original conditions of geometry and equilibrium, consolidation of arches (1 to 3), pillars, cutlery and encounters with the injection in the vaults of the work of art pre-dosed to the Hydraulic lime base ");
2 Systematic survey of the entire patrimonial occurrence area before and after deforestation until reaching the rocky substratum or mineral levels of the removed soils and systematic and integral archaeological monitoring of all plant earthwings in the areas of the pillars And meetings, in the works.
State
Complete
Date
To star in 15/12/2010.
Responsible
Artur Fontinha