AFA.2011.0043_Pontão on the Ribeira do Travasso, located at ER 2 at Km 239 + 689 Project of Rehabilitation / Replacement of the Work of Art
As a result of this Study, no Patrimonial Occurrences of either architectural, archaeological or ethnographic nature were identified in the area of ​​direct and indirect project allocation. Through archaeological prospecting and documentary surveys, as mentioned above, no structures, habitats or traces were found that could impede the continuation of the project. It is considered that the project of Rehabilitation / Replacement of the Pontão Art Work on the Ribeira do Travasso, situated in ER 2 at Km 239 + 689 does not imply impacts to the heritage, reason why no measures of minimization were proposed.
State
Complete
Date
To star in 23/01/2012.
Responsible
Artur Fontinha