AFA.2007.0004_IP4 between the p. k. 67 + 500 and 72 + 256.40; P. k. 77 + 425 and 78 + 455.30; P. k. 84 + 150 and 84 + 825; P. k. 94 + 000 and 97 + 248.70, Amarante and Vila Real
- For asset element 23, because it is an area identified as the location of a Roman road, the class B minimization measure was proposed, which is related to the signaling and protection of the site, so as not to have an incidence of Impacts on the equity element; And exhaustive graphic and photographic survey of the traces in question, between km 84 + 450 and km 84 + 650.
- For the asset element 29, because it is close to the area to be affected, the class B minimization measure was proposed, which is related to the signaling and protection of the site, in order to avoid any incidence of impacts on the equity element; And exhaustive graphic and photographic survey of the traces in question.
As a general measure of minimization, permanent archaeological monitoring is proposed while deforestation work is carried out and involving soil movements at the subsoil level up to the substrate
State
Complete
Date
To star in 02/11/2007.
Responsible
Artur Fontinha