loading

AFA.2007.0004_IP4 between the p. k. 67 + 500 and 72 + 256.40; P. k. 77 + 425 and 78 + 455.30; P. k. 84 + 150 and 84 + 825; P. k. 94 + 000 and 97 + 248.70, Amarante and Vila Real

- For asset element 23, because it is an area identified as the location of a Roman road, the class B minimization measure was proposed, which is related to the signaling and protection of the site, so as not to have an incidence of Impacts on the equity element; And exhaustive graphic and photographic survey of the traces in question, between km 84 + 450 and km 84 + 650. - For the asset element 29, because it is close to the area to be affected, the class B minimization measure was proposed, which is related to the signaling and protection of the site, in order to avoid any incidence of impacts on the equity element; And exhaustive graphic and photographic survey of the traces in question. As a general measure of minimization, permanent archaeological monitoring is proposed while deforestation work is carried out and involving soil movements at the subsoil level up to the substrate

serviço 1

State

Complete

serviço 2

Date

To star in 02/11/2007.

serviço 3

Responsible

Artur Fontinha